<thead id="1hj7p"></thead>

      <cite id="1hj7p"><video id="1hj7p"></video></cite>

        Pressure test reservation

        新聞資訊

        新聞資訊

        Tonzo ppr quickly install the elevator base is listed in March

        2017-03-30
        Product pictures
         

        At the time of installation, a elevator base is installed at 1 m per interval.

        As shown in the figure below:

        Each hanger can be up to 600N.

        It's about 4.8 N per meter in full water,

        600N>>>>>>4.8N。



        Ensure the quality of the products is stable while ensuring the speed of installation.


        精品资源黄网站在线_18AV无码不卡在线_久久久久久久久久久无码_九色视频在线观看国产